How Many Yards Are In A Cement Truck? (Full Guide)

Home ยป How Many Yards Are In A Cement Truck? (Full Guide)

ยท

How Many Yards Are In A Cement Truck

If you’re planning a driveway, patio, slab, or foundation, one of the first questions you’ll ask is: How Many Yards Are In A Cement Truck? Ordering too little concrete can delay your project. Ordering too much wastes money.

How Many Yards Are In A Cement Truck

In this detailed guide, youโ€™ll learn exactly how many cubic yards a cement truck carries, what affects capacity, and how to calculate the right amount for your job โ€” step by step.


How Many Yards Are In A Cement Truck on Average?

The short answer:

A standard cement (concrete) truck typically carries 8 to 10 cubic yards of concrete.

Read too: Franklin Truck Parts Near Me: Your Complete Guide to Local Truck Parts & Repair Solutions

However, capacity varies depending on:

  • Truck size
  • Axle configuration
  • State weight regulations
  • Type of concrete mix

Most ready-mix trucks in the United States are designed to carry 10 cubic yards, but they often transport 8โ€“9 yards to comply with legal road weight limits.

Quick Reference Table

Truck TypeAverage Capacity
Standard Mixer8โ€“10 cubic yards
Small Mixer4โ€“6 cubic yards
Large Commercial10โ€“14 cubic yards

For context, 1 cubic yard equals 27 cubic feet.

Concrete is transported in a rotating drum truck, officially known as a concrete mixer truck (see: https://en.wikipedia.org/wiki/Concrete_mixer).


Why Donโ€™t All Trucks Carry 10 Full Yards?

While manufacturers often advertise 10-yard drums, trucks rarely carry a full 10 yards because of weight limits.

Concrete Weight Matters

Concrete weighs approximately:

4,000 pounds per cubic yard

So:

10 cubic yards ร— 4,000 lbs = 40,000 pounds of concrete

When you add:

You quickly reach federal road limits of around 80,000 pounds gross vehicle weight.

Thatโ€™s why many deliveries are limited to 8 or 9 cubic yards per load.


How Many Yards Are In A Cement Truck for Residential Projects?

For most residential jobs, deliveries fall into predictable ranges.

Common Projects & Concrete Needs

ProjectTypical Yards Needed
Driveway (2-car)10โ€“16 yards
Patio (12ร—12 ft)2โ€“3 yards
Sidewalk (4ร—50 ft)3โ€“4 yards
Garage Slab (20ร—20 ft)8โ€“10 yards

Example:

A 20 ft ร— 20 ft slab at 4 inches thick requires about:

  • Convert inches to feet โ†’ 4 inches = 0.33 ft
  • 20 ร— 20 ร— 0.33 = 132 cubic feet
  • Divide by 27 โ†’ 4.9 cubic yards

Always add 5โ€“10% extra for waste.


How Do You Calculate How Many Yards You Need?

Hereโ€™s a simple step-by-step method:

Step 1: Measure Length (L)

Example: 20 feet

Step 2: Measure Width (W)

Example: 20 feet

Step 3: Measure Depth (D)

Example: 4 inches = 0.33 feet

Step 4: Multiply

L ร— W ร— D
20 ร— 20 ร— 0.33 = 132 cubic feet

Step 5: Convert to Cubic Yards

Divide by 27

132 รท 27 = 4.89 cubic yards

Step 6: Add Extra

Add 10%

4.89 ร— 1.10 = 5.38 cubic yards

Order 5.5 to 6 yards


Can a Cement Truck Pour Partial Loads?

Yes.

Concrete suppliers often allow partial loads. However:

  • Short-load fees may apply
  • Smaller deliveries cost more per yard

For example:

  • Full truck (8 yards): lower cost per yard
  • 3-yard delivery: higher per-yard rate

Itโ€™s more economical to combine small jobs if possible.


Whatโ€™s the Difference Between Cement and Concrete?

Many people ask about โ€œcement trucks,โ€ but technically:

  • Cement is a powder ingredient
  • Concrete is cement + sand + gravel + water

In the U.S., the terms are used interchangeably in everyday language.


How Many Yards Are In A Small Cement Truck?

Smaller trucks are common in urban areas or tight job sites.

Typical capacity:

4 to 6 cubic yards

Advantages:

  • Easier maneuverability
  • Less risk of driveway damage
  • Ideal for small patios or footings

Disadvantages:

  • Higher cost per yard
  • More trips for larger projects

How Long Does It Take to Pour a Full Truck?

A standard truck unloads at:

1 cubic yard per minute

So:

  • 8 yards = ~8 minutes
  • 10 yards = ~10 minutes

However, actual time depends on:

  • Crew size
  • Site access
  • Pump or chute usage

Concrete typically begins setting within 90 minutes, so preparation is critical.


How Many Yards Are In A Cement Truck for Commercial Jobs?

Commercial construction often uses:

  • Multiple truck deliveries
  • Larger 12โ€“14 yard capacity trucks
  • Continuous pouring schedules

Example:

A 10,000 sq ft warehouse slab at 6 inches thick requires:

  • 10,000 ร— 0.5 ft = 5,000 cubic feet
  • 5,000 รท 27 = 185 cubic yards

Thatโ€™s roughly:

185 รท 9 yards per truck = 21 truckloads


Factors That Affect Cement Truck Capacity

Several variables determine actual load size:

1. State Road Regulations

Weight laws vary by state.

2. Axle Configuration

More axles = higher allowable weight.

3. Concrete Mix Design

High-strength mixes can weigh slightly more.

4. Jobsite Distance

Long distances may reduce load size to prevent spillage or compliance issues.


Pros vs Cons of Ordering a Full Truck

Advantages

  • Lower cost per yard
  • Fewer delivery fees
  • Faster completion

Disadvantages

  • Risk of over-ordering
  • Requires adequate crew
  • Potential waste

Planning accurately is essential.


FAQ: How Many Yards Are In A Cement Truck?

How many yards are in a cement truck in the U.S.?

Most trucks carry 8โ€“10 cubic yards, though legal weight limits often reduce loads to 8โ€“9 yards.


How much does 10 yards of concrete weigh?

Approximately 40,000 pounds, depending on mix design.


Can I order less than 5 yards?

Yes, but short-load fees may apply.


How many bags of concrete equal one truck?

One cubic yard equals about 45โ€“60 80-lb bags.
So 8 yards would equal roughly 360โ€“480 bags.


How many yards are in a small cement truck?

Small trucks usually carry 4โ€“6 cubic yards.


Is it cheaper to mix your own concrete?

For small projects under 1 yard, maybe.
For anything larger, delivery is typically cheaper and more consistent.


Final Thoughts

So, How Many Yards Are In A Cement Truck?

In most cases, expect 8 to 10 cubic yards per truck, with 8โ€“9 yards being the most common delivered amount due to weight limits.

Understanding capacity helps you:

  • Avoid delays
  • Prevent waste
  • Control costs
  • Plan labor effectively

Before ordering, calculate your volume carefully and add 5โ€“10% extra. A few minutes of math can save hundreds of dollars.

If you found this guide helpful, share it with your contractor, neighbor, or DIY friends planning their next concrete project.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *